Project Name | Date of Completion | Construction Category |
---|---|---|
CSC #Phase 1&2 Coke Oven Revamping Project of Utility Pipelines. | 2023.02 | Mechanical Engineering |
CSC Power Plant Remove Project of Demining Water Tanks and Pumps. | 2021.11 | Mechanical Engineering |
Pipeline Revamping Project of Relief Valve on the West Side of Dragon Steel No. 2 Blast Furnace. | 2021.06 | Mechanical Engineering |
CSC #Phase 1&2 Double-Line Project of Mixing Lines. | 2021.04 | Mechanical Engineering |
CSMC Ammonia Nitrogen Reduction Reclamation Project of Discharged Water. | 2017.12 | Mechanical Engineering |
Mainland Water Diversion (Water Pipe) Project in Kinmen. | 2017.09 | Mechanical Engineering |
MagnPower New Construction Project of Hard Magnetic Powder Plant. | 2016.04 | Mechanical Engineering |
CECK Mechanical and Electrical Equipment Fabrication and Installation Engineering. | 2015.09 | Mechanical Engineering |
CSCI's Utilities Supply. | 2013.09 | Mechanical Engineering |
CSVC Cold Rolling Mill Installation and Piping Project. | 2013.06 | Mechanical Engineering |
CSAC #Phase 2 Expansion of Utilities-Pipe Bridge Project. | 2013.05 | Mechanical Engineering |
Utilities Turnkey Project of CHS Chang-Bin API Plant. | 2013.04 | Mechanical Engineering |
CSC Pilot Plant for Producing Biomass Coal from Oil Palm Fruit Fiber in Malaysia. | 2013.04 | Mechanical Engineering |
Piping, Equipment Installation and Thermal Insulation and Cold Preservation Project of #Phase 2 By-product Factory in Dragon Steel. | 2012.12 | Mechanical Engineering |